OLGA
Moderator: Production
OLGA
Olga for well-flow insurance exercise
1. http://www.megaupload.com/?d=ZR71JE6N
wait for next surprise
Best regards and God Bless you.
dairi
1. http://www.megaupload.com/?d=ZR71JE6N
wait for next surprise
Best regards and God Bless you.
dairi

-
- Junior member
- Posts: 55
- Joined: Wed Aug 01, 2007 12:48 am
-
- Junior member
- Posts: 65
- Joined: Wed Dec 05, 2007 9:33 am
- Location: Texas, USA
Thank you very much Dairi for uploading.
I am taking the liberty to write two short comments.
First, I think that for profiles output, it could be interesting to add two other variables: UG and UL (liquid and gas velocity). Indeed I saw on the Harthun/Shutin case that UG/UL become negative some time at the last section of your pipe. Do you accept to have a flow from the receiving separator to the pipe? To avoid that, I use to put a checkvalve at the end of the branch: in your case PIPE-28 section 2. The pressure profile can be really affected by this flow behaviour (especially for multiphase case).
The second comment is about your PIG setup. Your pipe has a 19.00039"ID and you put 19" for your pig diameter - You choose a gap between the pig and the pipe wall less than (2 X ROUGHTNESS). Have you a realistic reference?
TB
I am taking the liberty to write two short comments.
First, I think that for profiles output, it could be interesting to add two other variables: UG and UL (liquid and gas velocity). Indeed I saw on the Harthun/Shutin case that UG/UL become negative some time at the last section of your pipe. Do you accept to have a flow from the receiving separator to the pipe? To avoid that, I use to put a checkvalve at the end of the branch: in your case PIPE-28 section 2. The pressure profile can be really affected by this flow behaviour (especially for multiphase case).
The second comment is about your PIG setup. Your pipe has a 19.00039"ID and you put 19" for your pig diameter - You choose a gap between the pig and the pipe wall less than (2 X ROUGHTNESS). Have you a realistic reference?
TB
T. Bigex @@@ Offshore Oil&Gas Enigneer @@@
MS+1 Offshore Engineering -
Subsea engineering/Field development/Struc./SURF/Flow Assurance
- OPEN for job proposition -
MS+1 Offshore Engineering -
Subsea engineering/Field development/Struc./SURF/Flow Assurance
- OPEN for job proposition -
@tbigex
Thank you for the comment, is help to share information and knowledge,
first off all, the link that i uplaod its from original from base training (not for advance user), the only take sample module,
to answer your question, some time i have to back flow from separator to cross check the model, if any shut in schedule planing, so i make in my module (advance) the contingency planing if we have the shut in in deep water well, to avoid some flow insurance problem will come out.
cause you know, we only have 15 minute to star up the well again.
second question, you right i put the data like that to cross check if the Olga application software is good enough to recognize this problem, and as you know, i have the complete one but i think i cannot put in this post any more, still up set.
i am kind pet peeve for my post, cause hundred people viewed and up till know only 5 people reply,
i have a complete master training and also the module- step-by step to build the simulation model- August 2008 (Olga production simulation advance course) and if you know this course take cost about 2500 US dollar for 1 person only 3 days.
not worthy if i put in here.
Best regards,
Dairi
Production Technologist
Field development
(employee of 1 from 100 biggest Oil and gas based fortune magazine)
Thank you for the comment, is help to share information and knowledge,
first off all, the link that i uplaod its from original from base training (not for advance user), the only take sample module,
to answer your question, some time i have to back flow from separator to cross check the model, if any shut in schedule planing, so i make in my module (advance) the contingency planing if we have the shut in in deep water well, to avoid some flow insurance problem will come out.
cause you know, we only have 15 minute to star up the well again.
second question, you right i put the data like that to cross check if the Olga application software is good enough to recognize this problem, and as you know, i have the complete one but i think i cannot put in this post any more, still up set.
i am kind pet peeve for my post, cause hundred people viewed and up till know only 5 people reply,
i have a complete master training and also the module- step-by step to build the simulation model- August 2008 (Olga production simulation advance course) and if you know this course take cost about 2500 US dollar for 1 person only 3 days.
not worthy if i put in here.
Best regards,
Dairi
Production Technologist
Field development
(employee of 1 from 100 biggest Oil and gas based fortune magazine)
I downloaded your materials, did all, so it is really usefull, thousand thanks to you. Most of people have just a bit knowledge about OLGA, the materials from you help them much. I am highly appreciated your manner and eager to receive the advance course materials.dairi wrote:@tbigex
i have a complete master training and also the module- step-by step to build the simulation model- August 2008 (Olga production simulation advance course) and if you know this course take cost about 2500 US dollar for 1 person only 3 days.
Many thanks.