Search found 36 matches
- Fri Jan 18, 2019 9:59 pm
- Forum: Petroleum Engineering forum
- Topic: what is meant by ESP de-rating?
- Replies: 2
- Views: 7883
what is meant by ESP de-rating?
what is meant by ESP de-rating?
is it intentional ( i expected that there will be depletion in some well so i use large pump to produce the well {current condition }then de-rating the pump to match the depleted well in the future)?
or
it is a problem, that occur for the pump with time which ...
is it intentional ( i expected that there will be depletion in some well so i use large pump to produce the well {current condition }then de-rating the pump to match the depleted well in the future)?
or
it is a problem, that occur for the pump with time which ...
- Sun Oct 23, 2016 9:40 pm
- Forum: Drilling Services
- Topic: Workover Jobs (District Engineering)
- Replies: 3
- Views: 7898
Re: Workover Jobs (District Engineering)
thanks alot FANARCO,
I have books about well completion, but i think these books focus on academic side " this is great", but I also need Service companies manuals for these jobs, also the owner companies completion/re-completion well programs actual cases " if available".
Thanks in advance
I have books about well completion, but i think these books focus on academic side " this is great", but I also need Service companies manuals for these jobs, also the owner companies completion/re-completion well programs actual cases " if available".
Thanks in advance
- Sat Oct 22, 2016 2:50 am
- Forum: Petroleum Engineering forum
- Topic: Workover Jobs (District Engineering)
- Replies: 1
- Views: 6916
Workover Jobs (District Engineering)
Dear All,
I am recently hired as a District Engineer, I am responsible for Design and witness the following jobs
1- Perforating jobs ( TCP, Casing Gun& through Tbg Gun).
2- Lifting wells by N2 through coiled tubing & and test wells through testing units like Test Packages.
3- Wireline Jobs.
4 ...
I am recently hired as a District Engineer, I am responsible for Design and witness the following jobs
1- Perforating jobs ( TCP, Casing Gun& through Tbg Gun).
2- Lifting wells by N2 through coiled tubing & and test wells through testing units like Test Packages.
3- Wireline Jobs.
4 ...
- Sat Oct 22, 2016 2:45 am
- Forum: Drilling Services
- Topic: Workover Jobs (District Engineering)
- Replies: 3
- Views: 7898
Workover Jobs (District Engineering)
Dear All,
I am recently hired as a District Engineer, I am responsible for Design and witness the following jobs
1- Perforating jobs ( TCP, Casing Gun& through Tbg Gun).
2- Lifting wells by N2 through coiled tubing & and test wells through testing units like Test Packages.
3- Wireline Jobs.
4 ...
I am recently hired as a District Engineer, I am responsible for Design and witness the following jobs
1- Perforating jobs ( TCP, Casing Gun& through Tbg Gun).
2- Lifting wells by N2 through coiled tubing & and test wells through testing units like Test Packages.
3- Wireline Jobs.
4 ...
- Thu May 19, 2016 12:49 am
- Forum: Oil Well Drilling Engineering
- Topic: question about casing head spool & no.of casing srting
- Replies: 1
- Views: 7314
question about casing head spool & no.of casing srting
if we at well location, how can we determine no.of casing strings from no. of casing head spools without having the sketch of the well??
thanks in advance
thanks in advance
- Wed Mar 09, 2016 2:06 am
- Forum: Petroleum Engineering forum
- Topic: hydraulic fracture papers needed
- Replies: 2
- Views: 8015
hydraulic fracture papers needed
i need these papers, can anyone share them please
Technical Paper: Production Enhancement in the Egyptian Western Desert using the Channel-Fracturing Hi-Way Technique – A Field Case Study | Schlumberger
Application of Flow-Channel Fracturing Technique to Unlock Potential from Reservoirs with ...
Technical Paper: Production Enhancement in the Egyptian Western Desert using the Channel-Fracturing Hi-Way Technique – A Field Case Study | Schlumberger
Application of Flow-Channel Fracturing Technique to Unlock Potential from Reservoirs with ...
- Sat Feb 20, 2016 5:41 am
- Forum: Petroleum Engineering forum
- Topic: i need this book urgently
- Replies: 2
- Views: 7666
Re: i need this book urgently
thanks alotmrgmm wrote:Please find below;
- Fri Feb 19, 2016 9:09 pm
- Forum: Petroleum Engineering forum
- Topic: i need this book urgently
- Replies: 2
- Views: 7666
i need this book urgently
i need this book (( Well Testing Project Management: Onshore and Offshore Operations )), can anyone share it plz??
- Sat Jan 30, 2016 7:38 pm
- Forum: Petroleum Engineering forum
- Topic: IHRDC VIDEO LIBRARY needed
- Replies: 3
- Views: 9924
Re: IHRDC VIDEO LIBRARY needed
i need Hydraulic Fracture one badly.
- Wed Jul 31, 2013 8:57 pm
- Forum: Petroleum Engineering forum
- Topic: hydraulic fracturing job
- Replies: 3
- Views: 1871
- Wed May 22, 2013 7:49 pm
- Forum: Petroleum Engineering forum
- Topic: PRosper form IPM suite 8 (latest)
- Replies: 46
- Views: 76890
- Fri Mar 29, 2013 3:08 am
- Forum: Petroleum Engineering forum
- Topic: hydraulic fracturing job
- Replies: 3
- Views: 1871
hydraulic fracturing job
i need any material about (hydraulic fracturing job procedures and sequence ), can anyone help me, plz?
- Sun Mar 03, 2013 12:08 am
- Forum: Petroleum Engineering forum
- Topic: cased hole log /open hole log correlaion & dephh control
- Replies: 0
- Views: 1256
cased hole log /open hole log correlaion & dephh control
i need material about this topic with illustrative examples,can anyone help me ?
thanks in advance
thanks in advance
- Thu Nov 22, 2012 6:30 am
- Forum: Petroleum Engineering forum
- Topic: cased hole logging (REQUEST)
- Replies: 0
- Views: 1381
cased hole logging (REQUEST)
i need this IHRDC video (PE 154 cased hole logging),can anyone help me please?
- Sun Jun 10, 2012 4:38 am
- Forum: Conventional Reservoir Engineering
- Topic: Reservoir Engineering
- Replies: 13
- Views: 5355