Need help with Eclipse simulation
Moderator: Simulation_team
Need help with Eclipse simulation
Hi,
I need a help with making a reservoir simulation program. Everything is looks fine beside AQUCON. I am not sure what numbers shell i use. Can someone help me out?
I can upload a text of the exercise and my answer as well.
Aquifer
The part of the west- and south side of the reservoir that initially is below water (deeper than the oil water contact) is connected to an aquifer. The contact surface (X-section) between the aquifer and the reservoir is 464400 m2. (Aquifer to reservoir tran-mult is 1.0.) How far the aquifer reaches (
I need a help with making a reservoir simulation program. Everything is looks fine beside AQUCON. I am not sure what numbers shell i use. Can someone help me out?
I can upload a text of the exercise and my answer as well.
Aquifer
The part of the west- and south side of the reservoir that initially is below water (deeper than the oil water contact) is connected to an aquifer. The contact surface (X-section) between the aquifer and the reservoir is 464400 m2. (Aquifer to reservoir tran-mult is 1.0.) How far the aquifer reaches (
You do not have the required permissions to view the files attached to this post.
- Bilal Amjad
- Senior member
- Posts: 258
- Joined: Sat Sep 20, 2008 12:14 am
- Location: اسلامی جمہوریہ پاکستان
-
- Posts: 1
- Joined: Thu Jan 09, 2014 2:05 pm