Need help with Eclipse simulation

All Reservoir Simulation aspects

Moderator: Simulation_team

Post Reply
Ivanski
Posts: 1
Joined: Fri May 18, 2012 7:29 pm

Need help with Eclipse simulation

Post by Ivanski »

Hi,

I need a help with making a reservoir simulation program. Everything is looks fine beside AQUCON. I am not sure what numbers shell i use. Can someone help me out?
I can upload a text of the exercise and my answer as well.

Aquifer
The part of the west- and south side of the reservoir that initially is below water (deeper than the oil water contact) is connected to an aquifer. The contact surface (X-section) between the aquifer and the reservoir is 464400 m2. (Aquifer to reservoir tran-mult is 1.0.) How far the aquifer reaches (
You do not have the required permissions to view the files attached to this post.
User avatar
Bilal Amjad
Senior member
Posts: 258
Joined: Sat Sep 20, 2008 12:14 am
Location: اسلامی جمہوریہ پاکستان

Post by Bilal Amjad »

Have seen the AQUCON keyword in the ECLIPSE manual?
Bilal Amjad
Reservoir Engineering Consultant
gridsick85
Posts: 1
Joined: Thu Jan 09, 2014 2:05 pm

Post by gridsick85 »

this is as example of AQUCON:

--NUM I1 I2 J1 j2 K1 K2 FACE
1 12 24 102 113 1 1 'j+' /
1 12 24 102 113 2 2 'j+' /
1 12 24 102 113 3 3 'j+' /
/

Regards
User avatar
FANARCO
Administrator
Administrator
Posts: 2068
Joined: Mon Jul 10, 2006 9:56 pm
Contact:

Post by FANARCO »

We can use aquifer in PETREL to be in direct contact with the reservoir directly under OWC and the software will consider it in communication.
Post Reply