how to do a production allocation for mbal?
Moderator: moderators
how to do a production allocation for mbal?
I have this model on mbal that has 2 connected tanks, one is for the oil leg and the other for the gas cap (retrograde gas). I have to update the production history for both tanks but I only have the total accumulated production of oil and gas.
So the problem is, how do I separete the oil and gas that comes from the oil leg to add it to the production history of the oil tank and the same for the oil and gas that comes for the gas cap?
I already have the GOR for both oil leg and gas cap.
Thanks.
So the problem is, how do I separete the oil and gas that comes from the oil leg to add it to the production history of the oil tank and the same for the oil and gas that comes for the gas cap?
I already have the GOR for both oil leg and gas cap.
Thanks.