reserve estimation
Moderator: moderators
-
- Posts: 36
- Joined: Sat Nov 26, 2011 2:49 am
reserve estimation
reservoir with 100 MMSTB OOIP calculated from volumetric method and 120 MMSTB FROM material balance,what does this difference mean?
and if reverse is true, what does this mean?
thanks in advance
and if reverse is true, what does this mean?
thanks in advance
-
- Posts: 36
- Joined: Sat Nov 26, 2011 2:49 am