The problem that i am having is pretty simple,

In my simulation file the data is showing as the first time step.

My simulation date begins at 01 jan 2011. My each time step is 185 days. When I open the file in Floviz The day I see is 05 july 2011.

How can i correct this.
Please find attached the image of the sameImage
[left]http://bayimg.com/lagnBaAdi[/left]
Here
Image of the Floviz
petro_freak
Posts: 4
Joined: Mon Nov 22, 2010 7:13 pm
Location: Louisiana

Post by petro_freak »

I think you have to use the Timestep controls on the top lest corner of the screen to animate the simulation.

Cheers :)
User avatar
Abdelkader
Junior member
Posts: 72
Joined: Thu Aug 31, 2006 7:33 am
Location: algiers

Post by Abdelkader »

Hi,
it might be related to the timesteps your are using to load the reports!
check the RPTRST keyword (especially Freq) is it at each timestep or at each n timesteps?!
good luck,
cheers
Abdelkader Aissaoui