Time steps Floviz Eclipse
Moderator: Simulation_team
Time steps Floviz Eclipse
The problem that i am having is pretty simple,
In my simulation file the data is showing as the first time step.
My simulation date begins at 01 jan 2011. My each time step is 185 days. When I open the file in Floviz The day I see is 05 july 2011.
How can i correct this.
Please find attached the image of the same
[left]http://bayimg.com/lagnBaAdi[/left]
Here
Image of the Floviz
In my simulation file the data is showing as the first time step.
My simulation date begins at 01 jan 2011. My each time step is 185 days. When I open the file in Floviz The day I see is 05 july 2011.
How can i correct this.
Please find attached the image of the same
[left]http://bayimg.com/lagnBaAdi[/left]
Here
Image of the Floviz
-
- Posts: 4
- Joined: Mon Nov 22, 2010 7:13 pm
- Location: Louisiana
- Abdelkader
- Junior member
- Posts: 72
- Joined: Thu Aug 31, 2006 7:33 am
- Location: algiers