Shuting the well connection that exceeds the specific limit
Moderator: Simulation_team
- Bilal Amjad
- Senior member
- Posts: 258
- Joined: Sat Sep 20, 2008 12:14 am
- Location: اسلامی جمہوریہ پاکستان
Shuting the well connection that exceeds the specific limit
Which keyword and how is used for shuting the specific connection which mets the criteria set under ACTION (-,G,R,W,S,X) keyword?
For Example
Well P1 has 4 connections (1 per layer) I want well P1 to shut connection which exceeds water cut limit of 0.8.
For Example
Well P1 has 4 connections (1 per layer) I want well P1 to shut connection which exceeds water cut limit of 0.8.
Bilal Amjad
Reservoir Engineering Consultant
Reservoir Engineering Consultant
- Abdelkader
- Junior member
- Posts: 72
- Joined: Thu Aug 31, 2006 7:33 am
- Location: algiers
This might help
ACTIONW
ACTION1 'P2' WWCT > 0.8 10000 /
COMPDAT
--Name I J K1 K2 OPEN/SHUT
'P1' 26 5 1 1 'OPEN' 0 0 1 /
'P1' 26 5 2 2 'OPEN' 0 0 1 /
'P1' 26 5 3 3 'OPEN' 0 0 1 /
'P1' 26 5 4 4 'OPEN' 0 0 1 /
'P1' 26 5 5 5 'OPEN' 0 0 1 /
'P1' 26 5 6 6 'OPEN' 0 0 1 /
'P2' 26 13 1 1 'SHUT' 0 0 1 /
'P2' 26 13 2 2 'SHUT' 0 0 1 /
'P2' 26 13 3 3 'SHUT' 0 0 1 /
'P2' 26 13 4 4 'SHUT' 0 0 1 /
'P2' 26 13 5 5 'SHUT' 0 0 1 /
'P2' 26 13 6 6 'SHUT' 0 0 1 /
/
ENDACTIO
ACTIONW
ACTION1 'P2' WWCT > 0.8 10000 /
COMPDAT
--Name I J K1 K2 OPEN/SHUT
'P1' 26 5 1 1 'OPEN' 0 0 1 /
'P1' 26 5 2 2 'OPEN' 0 0 1 /
'P1' 26 5 3 3 'OPEN' 0 0 1 /
'P1' 26 5 4 4 'OPEN' 0 0 1 /
'P1' 26 5 5 5 'OPEN' 0 0 1 /
'P1' 26 5 6 6 'OPEN' 0 0 1 /
'P2' 26 13 1 1 'SHUT' 0 0 1 /
'P2' 26 13 2 2 'SHUT' 0 0 1 /
'P2' 26 13 3 3 'SHUT' 0 0 1 /
'P2' 26 13 4 4 'SHUT' 0 0 1 /
'P2' 26 13 5 5 'SHUT' 0 0 1 /
'P2' 26 13 6 6 'SHUT' 0 0 1 /
/
ENDACTIO
- Bilal Amjad
- Senior member
- Posts: 258
- Joined: Sat Sep 20, 2008 12:14 am
- Location: اسلامی جمہوریہ پاکستان
thanks, it is the same I have already done,
But my ques was the ECLIPSE itself shut the worst performing perforation. in above example you have specified the perforation.
Do You mean we have to see the each connection report in the .prt file and then decide which perforation should be shut using ACTIONW?
But my ques was the ECLIPSE itself shut the worst performing perforation. in above example you have specified the perforation.
Do You mean we have to see the each connection report in the .prt file and then decide which perforation should be shut using ACTIONW?
Bilal Amjad
Reservoir Engineering Consultant