Eclipse Experts

All Reservoir Simulation aspects

Moderator: Simulation_team

Post Reply
enioil
Senior member
Posts: 281
Joined: Fri Jun 01, 2007 8:15 pm
Location: Montanuniversität

Eclipse Experts

Post by enioil »

Dear All,,,
I hope all are fine...

I am a new user in ECLIPSE 100 and I have been asked to perform the attached excercise...Can any body do it for me, then I can check my results with him... The dead line in on 21/01/2009

I thank you all for your contribution...
http://www.4shared.com/file/81093122/e6 ... oject.html

Regards
Best Regards,,,

Eni Oil
Montan University
enioil
Senior member
Posts: 281
Joined: Fri Jun 01, 2007 8:15 pm
Location: Montanuniversität

Post by enioil »

It seems nobody will help
Anyway, Thanks for ALL

Regards
Best Regards,,,

Eni Oil
Montan University
User avatar
X880862531X
Senior member
Posts: 218
Joined: Wed Feb 06, 2008 8:37 pm
Contact:

Post by X880862531X »

enioil wrote:It seems nobody will help
Anyway, Thanks for ALL

Regards
No dear, I hope u get help very soon.. It may be just a matter of time. Just wait, I am sure there r eclipse users here. Also, I will ask some friends, they may help :wink: .
Best regards,
[highlight=yellow]Hosam[/highlight]
Forum administration member

Petroleum engineering B.Sc

3-2010 : 3-2011
Assistant petroleum production consultant

3-2011 till now
Well completion & workover supervisor
doombuggy
Posts: 33
Joined: Mon Jul 09, 2007 7:24 pm

Post by doombuggy »

Enioil I have looked into your file..but I dont have an exclusive eclipse license as I am on holiday. But i will see what i can do..how soon do you need this done? I hope we have some time left.

Regards
enioil
Senior member
Posts: 281
Joined: Fri Jun 01, 2007 8:15 pm
Location: Montanuniversität

Post by enioil »

Thanks doombuggy,
We still have about 5 days left.

I appreciate your concern,

Have a nice Holiday
Best Regards,,,

Eni Oil
Montan University
hooman_teh
Junior member
Posts: 54
Joined: Sun Dec 28, 2008 2:10 pm
Location: Norway

Post by hooman_teh »

Hi everybody

I am wrtitng my thesis with ECLIPSE and Petrell RE (2010) and I need to close all injection wells, I was wondering if there is a way other than and easier than manually comment out all those wells.

The only thing is I am not working on a prediction simulation i.e I do not have any WCONINJE or WCONPROD in my data file, instead I have WCONINJH and WCONHIST. I know one can use WELOPEN for shutting down the wells, but I cannot use that here, since I only have historical rates! Is there any way for shuiting down historical wells with out manually shutting down all of them?

Anyone has any suggestion? I would really appreciate your comments.
challenge the well-known, explore the unknown!
User avatar
Bilal Amjad
Senior member
Posts: 258
Joined: Sat Sep 20, 2008 12:14 am
Location: اسلامی جمہوریہ پاکستان

Post by Bilal Amjad »

Changing Historical rates will lead to in-accuracy in forecasting.
Bilal Amjad
Reservoir Engineering Consultant
miroine
Posts: 6
Joined: Tue Nov 25, 2008 7:43 am

Post by miroine »

Hi
just create a well list using WLIST
in a Worpad try to use the replace button in File and tape : -- WCONINJH in stead of WCONINJ (this is comment or yr injection history) and use GCONINJE

hope it can help y
hooman_teh
Junior member
Posts: 54
Joined: Sun Dec 28, 2008 2:10 pm
Location: Norway

Post by hooman_teh »

@Bilal:

Thank you for your comment but it seems that you did not understand my question at all. It is obvious that by changing the historical rates everything changes. The point is that I do not need the model for forcasting. I am doing a backward study!

@miroine:

I do not have any WCONINJ keyword! Please read my message once more.

The point is I only have WCONINJH and WCONHIST. I have a history matched model til 2010 and I want to study what would happen if we would not have injected water from day first. You see the point now? There is no forcasting, there is no keyword relating to forcasting only historical rate and historical keywords are in the DATA file. Now I want to shut all historical injectors. I can do them by manually closing all injectors. Do you know any other way? In forcasting case you can use WELOPEN keyword for shutting and reopening wells but not in my case that I do not have any WCONPROD or WCONINJ keywords, hope now it clarifies the question.

Thank you again for your comments.
challenge the well-known, explore the unknown!
Post Reply