Gyro data training manual
Moderator: Drilling
- X880862531X
- Senior member
- Posts: 218
- Joined: Wed Feb 06, 2008 8:37 pm
- Contact:
Thank u very much..
Really I didn't check yr links yet, but I hope it is working.
Do u have other links or u finished??
If u finished, Do u mind if I accumulated all these links in one post??
Again..Thanks 4 yr effort
Really I didn't check yr links yet, but I hope it is working.
Do u have other links or u finished??
If u finished, Do u mind if I accumulated all these links in one post??
Again..Thanks 4 yr effort
Best regards,
[highlight=yellow]Hosam[/highlight]
Forum administration member
Petroleum engineering B.Sc
3-2010 : 3-2011
Assistant petroleum production consultant
3-2011 till now
Well completion & workover supervisor
[highlight=yellow]Hosam[/highlight]
Forum administration member
Petroleum engineering B.Sc
3-2010 : 3-2011
Assistant petroleum production consultant
3-2011 till now
Well completion & workover supervisor
- X880862531X
- Senior member
- Posts: 218
- Joined: Wed Feb 06, 2008 8:37 pm
- Contact:
I am just the moderator of [highlight=yellow]oil well drilling engineering forum[/highlight] & FANARCO is our moderator..
***
I downloaded the last link & the file is not corrupted..It is working
Thank u very much..
Take yr time
please, when u post the last link, Tell us that it is the last one..So that I can arrange this topic..
***
I downloaded the last link & the file is not corrupted..It is working
Thank u very much..
Take yr time
please, when u post the last link, Tell us that it is the last one..So that I can arrange this topic..
Last edited by X880862531X on Tue Apr 15, 2008 10:09 pm, edited 1 time in total.
Best regards,
[highlight=yellow]Hosam[/highlight]
Forum administration member
Petroleum engineering B.Sc
3-2010 : 3-2011
Assistant petroleum production consultant
3-2011 till now
Well completion & workover supervisor
[highlight=yellow]Hosam[/highlight]
Forum administration member
Petroleum engineering B.Sc
3-2010 : 3-2011
Assistant petroleum production consultant
3-2011 till now
Well completion & workover supervisor