SPE North AFRICA 14 - 16 sept Heliopolis Cairo

Gravel Pack, Artificial lifting systems, Vertical Lift Performance and Well bore problems.......

Moderator: Production

Post Reply
ag69905
Posts: 12
Joined: Thu Apr 19, 2012 5:47 pm

SPE North AFRICA 14 - 16 sept Heliopolis Cairo

Post by ag69905 »

Anyone will partecipate at the conference ... any pubblication, abstract or so ever?

Some Eng. of our group will present a paper about the integrated production network of one of the our gas and condensate field.
keywords;

Production data
Pressure study data
PVT data reports
Network model
Matching network model
Production system debottlenecking
System optimization
Flow assurance

regards
User avatar
FANARCO
Administrator
Administrator
Posts: 2063
Joined: Mon Jul 10, 2006 9:56 pm
Contact:

Re: SPE North AFRICA 14 - 16 sept Heliopolis Cairo

Post by FANARCO »

For me not possible to attend

Could you please share these articles ...
ag69905
Posts: 12
Joined: Thu Apr 19, 2012 5:47 pm

Re: SPE North AFRICA 14 - 16 sept Heliopolis Cairo

Post by ag69905 »

Alternate 175766 Integrated Field Management Using Advanced Techniques For Offshore Gas Condensate Field.
A. Fadel, H. Safwat, A. Labib, M. El-Dabbour, Abu Qir Petroleum; M. Nagy, H.M. Darwish, Schlumberger



For the moment is under revision when it will be available will be my duty share with You

Regards
User avatar
FANARCO
Administrator
Administrator
Posts: 2063
Joined: Mon Jul 10, 2006 9:56 pm
Contact:

Re: SPE North AFRICA 14 - 16 sept Heliopolis Cairo

Post by FANARCO »

ag69905 wrote:Alternate 175766 Integrated Field Management Using Advanced Techniques For Offshore Gas Condensate Field.
A. Fadel, H. Safwat, A. Labib, M. El-Dabbour, Abu Qir Petroleum; M. Nagy, H.M. Darwish, Schlumberger



For the moment is under revision when it will be available will be my duty share with You

Regards

Really it is very interesting topic
ag69905
Posts: 12
Joined: Thu Apr 19, 2012 5:47 pm

Re: SPE North AFRICA 14 - 16 sept Heliopolis Cairo

Post by ag69905 »

FANARCO wrote:
ag69905 wrote:Alternate 175766 Integrated Field Management Using Advanced Techniques For Offshore Gas Condensate Field.
A. Fadel, H. Safwat, A. Labib, M. El-Dabbour, Abu Qir Petroleum; M. Nagy, H.M. Darwish, Schlumberger



For the moment is under revision when it will be available will be my duty share with You

Regards

Really it is very interesting topic

For copyright reason I can not post the paper before the presentation in Heliopolis. Anyway here the abstract. I hope it's enough for the moment.

Thanks

Regards



SPE-175766-MS
Integrated Field Management Using Advanced Techniques for Offshore Gas Condensate Field
A. Fadel, H. Safwat, M. Dabbour, A. Labib and A. Belli, Abu Qir Petroleum Company; H. Darwish, and M. Nagy, Schlumberger
Copyright 2015, Society of Petroleum Engineers

This paper was prepared for presentation at the SPE North Africa Technical Conference and Exhibition held in Cairo, Egypt, 14–16 September 2015.

This paper was selected for presentation by an SPE program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been reviewed by the Society of Petroleum Engineers and are subject to correction by the author(s). The material does not necessarily reflect any position of the Society of Petroleum Engineers, its officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Society of Petroleum Engineers is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of SPE copyright.


Abstract

Abu Qir Petroleum Company is one of the most important gas operators In Egypt. AQP Holds 100% of the exploration, development and production rights of the Abu Qir concession in the Nile Delta offshore. The offshore facilities include six platforms, 34 wells and a network of sea pipelines. Abu Qir Petroleum Company currently is interested in modeling their entire production system from the perforations to the onshore Facility to understand and identify all constraints in the system and the way to improve it. In addition, AQP is interested in identifying any bottlenecks either currently or in the future after adding any platforms or wells according to their intended FDP and to test some operational scenarios like changing terminal pressure, separator pressure, installing compression station, etc.
The main objective of this project is to identify any current and future bottlenecks in the production system while honoring operational constraints on wells, production separators, pipelines, and total field gas/liquid processing capacity and identifying any flow assurance issues taking into consideration different field development scenarios for an offshore gas condensate field in the Mediterranean (Abu Qir Field). In many mature gas fields, reservoir pressure decline as a result of gas depletion tends to lead to the onset of liquid loading. Liquid loading in gas wells occur when the gas flow rate falls below a critical rate due to reservoir depletion where the accompanying liquids cannot be lifted to surface. Such liquid accumulations at the wellbore can cause the gas well to cease production eventually. Transient simulation was used to build transient well models that replicate observed field data, and these models are then used to evaluate specific gas well deliquification techniques.
This document summarizes the methodology and the results of the complementary work carried out to conduct the project. The document presents the methodology to review, evaluate and optimize the offshore production system from reservoir sand-face up to wellhead starting from data gathering and QC up to estimating the missing reservoir parameters needed for well history matching ending with history matched well models and surface network ready for any optimization if the conditions change.