.::FANARCO::. • Tutorial: History matching using ECLIPSE Office and SimOpt

Tutorial: History matching using ECLIPSE Office and SimOpt

All Reservoir Simulation aspects

Moderator: Simulation_team

Tutorial: History matching using ECLIPSE Office and SimOpt

Postby FANARCO » Mon Mar 16, 2015 3:51 pm

.


This tutorial examines the integration of an ECLIPSE Office project with the SIS history matching aid, SimOpt.

In this example an existing simulation, along with associated historical well water-cut data, is imported into ECLIPSE Office to provide a basic project and examine the match between the simulation model and the well history.

The project is then exported into SimOpt, where the match can be analyzed using the ECLIPSE gradients option and a regression problem can be set up that is used to improve the history match.

The matched simulation model is then exported from SimOpt and associated with the ECLIPSE Office project as a new case.

Prediction simulations are made using the multiple runs options in ECLIPSE Office.

This tutorial has been broken down into stages. Each stage is self-contained and can be used independently of the full tutorial.
You do not have the required permissions to view the files attached to this post.
User avatar
FANARCO
Administrator
Administrator
 
Posts: 1956
Joined: Mon Jul 10, 2006 9:56 pm

Re: Tutorial: History matching using ECLIPSE Office and SimO

Postby soman703 » Mon Nov 30, 2015 9:13 am

Thankyou so much!

Many thanks!!!!
soman703
Junior member
 
Posts: 93
Joined: Sun Nov 29, 2015 10:34 am


Return to Reservoir Simulation

Who is online

Users browsing this forum: No registered users and 1 guest

cron