What is Pilot Test and How it is Important?

Well Test Analysis, Pressure and Production Monitoring........ etc.

Moderator: moderators

Post Reply
User avatar
Bilal Amjad
Senior member
Posts: 258
Joined: Sat Sep 20, 2008 12:14 am
Location: اسلامی جمہوریہ پاکستان

What is Pilot Test and How it is Important?

Post by Bilal Amjad »

I have read this term in many papers but still not know its meaning.
Bilal Amjad
Reservoir Engineering Consultant
egydriller
Junior member
Posts: 50
Joined: Sat Nov 13, 2010 6:51 pm
Location: alexandria
Contact:

Post by egydriller »

me 2
User avatar
adrian
Senior member
Posts: 136
Joined: Wed Jun 30, 2010 8:50 pm

Post by adrian »

The term "Pilot Test" in the reservoir engineering is usually referring to that if you made any simulation modelling study or even conventional reservoir engineering study and you have doubt about the results then you can make a pilot test.

i.e. if you have a huge reservoir and your study recommend to make a water injection project so, you can inject water in a chosen well and see the effect on another well in a sector of the model.

If you succeeded in this pilot test you can apply to the whole field
User avatar
Bilal Amjad
Senior member
Posts: 258
Joined: Sat Sep 20, 2008 12:14 am
Location: اسلامی جمہوریہ پاکستان

Post by Bilal Amjad »

thanks adrian.
Bilal Amjad
Reservoir Engineering Consultant
Post Reply