LWD

Articles, Softwares, ..... etc

Moderator: Drilling

Post Reply
jorge0452
Posts: 11
Joined: Tue Mar 06, 2007 2:06 am

LWD

Post by jorge0452 »

Does anybody has experience working with LWD in a vertical well.
Could it replace with adventage (economic and thechnical) the use of the wireline electrical logging.

thanks for opinions.

regards.
User avatar
X880862531X
Senior member
Posts: 218
Joined: Wed Feb 06, 2008 8:37 pm
Contact:

Post by X880862531X »

In this link

http://en.wikipedia.org/wiki/Logging_While_Drilling

[align=justify]U can see that LWD can be used as a resistivity logging, but I am not sure if it can totally replace the conventional electrical logging or not.

I will post some data related to the LWD.
[/align]
Best regards,
[highlight=yellow]Hosam[/highlight]
Forum administration member

Petroleum engineering B.Sc

3-2010 : 3-2011
Assistant petroleum production consultant

3-2011 till now
Well completion & workover supervisor
Post Reply