Search found 2 matches

by sys71405
Sun Dec 15, 2013 1:24 am
Forum: Petroleum Engineering forum
Topic: Request: Hydraulic fracturing, standard operations
Replies: 0
Views: 1111

Request: Hydraulic fracturing, standard operations

Hi everyone, I am new to this forum and oil and gas sector as well. I wanted to know if any one has any standard operating procedure for hydraulic fracturing. Not BJ manual or book by Economides. I want any material that can help me setting appropriate number of corners (Full and half) and pipelines...
by sys71405
Wed Nov 27, 2013 1:05 pm
Forum: Petroleum Engineering forum
Topic: Request: Stimulation jobs: Standard practices in field?
Replies: 0
Views: 1023

Request: Stimulation jobs: Standard practices in field?

Hi everyone,
I was wondering if there is any standard practice to connect pumper with well or not - for example to have atleast 2-3 full/half corners etc. Also, if there is any material available for stimulations except Economides and BJ manual.
Thanks in advance.