Search found 1 match

by J
Fri Jun 10, 2011 11:26 pm
Forum: Conventional Reservoir Engineering
Topic: Fill up time in WATERFLOODING
Replies: 3
Views: 3277

For clastics reservoir: 1. Bottomhole pressure limit of injector should be the fracture pressure. You should estimate the fracture pressure of the reservoir, and ensure that the bottomhole injection pressure does not exceed the reservoir fracture pressure. 2. The minimum reservoir pressure of a rese...