Search found 11 matches

by jorge0452
Sat May 30, 2009 5:16 am
Forum: Oil Well Drilling Engineering
Topic: LWD
Replies: 1
Views: 1163

LWD

Does anybody has experience working with LWD in a vertical well.
Could it replace with adventage (economic and thechnical) the use of the wireline electrical logging.

thanks for opinions.

regards.
by jorge0452
Fri Mar 27, 2009 11:37 pm
Forum: Oil Well Drilling Engineering
Topic: DST in 5 in Cased hole.
Replies: 2
Views: 1769

DST in 5 in Cased hole.

Experts. Please I need your Help. Talking about a vertical well, 1500 m MD in a drilling Offshore exploration campaign. Is possible think in perform DST in 5 in cased Hole???. The market has the appropiate tools for this Job in that diameter?? And the perforating technique??? TCP is posible??? Last ...
by jorge0452
Tue Mar 24, 2009 4:30 am
Forum: Oil Well Drilling Engineering
Topic: Osprey Risk Tutorial
Replies: 0
Views: 1110

Osprey Risk Tutorial

If anybody has an osprey risk tutorial other that the included in the soft. maybe could to share it.

Thank very much in advance.
by jorge0452
Thu Apr 03, 2008 4:52 am
Forum: Conventional Reservoir Engineering
Topic: RFT vs. DST
Replies: 5
Views: 8869

RFT vs. DST

Dear friend
I have aquestion about well Testing.

Can RFT (or WFT) method (using a modern tool like MDT) reemplace the information that we can get by DST.(in cased hole) ??
we are talking about an exploration vertical well. Sandstone. low permeabilty. Normal gradient.

thanks very much.
by jorge0452
Tue Apr 01, 2008 11:31 pm
Forum: Conventional Reservoir Engineering
Topic: Model Contract Form
Replies: 0
Views: 575

Model Contract Form

Does one
of your colleagues have a Model Contract form, including if is possible Thecnical Bases, for a Call For Tender
by jorge0452
Mon Mar 31, 2008 10:41 pm
Forum: Conventional Reservoir Engineering
Topic: Well testing
Replies: 5
Views: 1575

Thanks very much for the usefull information. Now a have more clear the way. In our case is Sandtone. One more thing. Is possible think in to get some information comparing the different down hole tools offering currently by the market??. I say this because could be important before we will perform ...
by jorge0452
Mon Mar 31, 2008 12:14 am
Forum: Conventional Reservoir Engineering
Topic: Well testing
Replies: 5
Views: 1575

Thanks a lot for your early reply. I have a couple of things more: I have been estudied a well drilled years ago close to our future operations. They drilled to 1722 m, 7" casing. (float collar in 1708 m) a) 4 gun/ft 1671-1676, test, bridge plug. b) gun 1658-1659/1661-1665.5, test, brid plug in...
by jorge0452
Sun Mar 30, 2008 5:49 am
Forum: Conventional Reservoir Engineering
Topic: Well testing
Replies: 5
Views: 1575

Well testing

I am working in a offshore exploration drilling project. We will drill oil and gas vertical wells to 1600-1800 mMD using a Jack Up. The operating daily cost is stimate in 350.000 USD/day. Wells will be test using DST en 7" cased hole. Probably it will neccesary perform 3 or 4 DST (because we ha...
by jorge0452
Thu Dec 27, 2007 4:36 am
Forum: Oil Well Drilling Engineering
Topic: Schlumberger - Drilling Office manual
Replies: 26
Views: 15595

Thanks very much
by jorge0452
Mon Aug 20, 2007 9:56 pm
Forum: Oil Well Drilling Engineering
Topic: Torque and Drag
Replies: 5
Views: 2229

Torque and Drag

I need your help. Does anybody has a excel based software about torque and drag??.
I need to study the surface tension in a horizontal well.

thanks a lot.
by jorge0452
Sun Aug 12, 2007 12:04 am
Forum: Oil Well Drilling Engineering
Topic: Risk Analysis
Replies: 1
Views: 1407

Risk Analysis

Hi. Could anyone please provide information about risk analysis for wells construction?? Among others, I am looking for the following papers: 1.- "Risk analysis of drilling and well operations" (paper SPE/IADC 219952) 2.- "Probabilistic modeling for well-constrution perfomance managem...