Search found 3 matches
- Tue Oct 21, 2008 8:51 am
- Forum: Conventional Reservoir Engineering
- Topic: Hydrocarbon pore volume Injected (HCPVI)
- Replies: 5
- Views: 10322
- Mon Oct 20, 2008 1:46 pm
- Forum: Conventional Reservoir Engineering
- Topic: Hydrocarbon pore volume Injected (HCPVI)
- Replies: 5
- Views: 10322
Hydrocarbon pore volume Injected (HCPVI)
Hello Everyone:
I have the volume of water injected in reservoir barrels and I can compute the hydrocarbon pore volune. so How do I compute the hydrocarbon pore volume injected?
Thanks for the help.
Ariel
I have the volume of water injected in reservoir barrels and I can compute the hydrocarbon pore volune. so How do I compute the hydrocarbon pore volume injected?
Thanks for the help.
Ariel
- Wed Sep 17, 2008 5:39 am
- Forum: Conventional Reservoir Engineering
- Topic: Water Injection Requirements
- Replies: 6
- Views: 2777
Water Injection Requirements
We have a field that we want to waterflood. First question we would like to determine is the amount of water to be injected. As a rough calculation, we can just match the voidage withdrawal to come up up with the answer. But is there any calculation that I can use to estimate the volume of water? Ar...