Search found 1 match
- Thu Jul 02, 2009 11:13 pm
- Forum: Conventional Reservoir Engineering
- Topic: Abnormal build-up behavior
- Replies: 1
- Views: 1255
Pressure Anomalous behavior: A pressure drop is observed after some time of bottom hole shut-in. This was a very common behavior in several well is the south of Texas. It was simulated in laboratory (Universtity of Texas/Shell Oil Co) that this happens as result of phase redistribution at middle tim...